State Bid

Last Updated on 17 Jan 2024 at 5 AM
bid
Palmdale California

Palmdale Blvd. (SR-138) / SR 14

Solicitation ID PN 672
Posted Date 17 Jan 2024 at 5 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Palmdale
Location Palmdale California United states
The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer and/or his designee. The work may consist of but is not limited to: Widen the northbound SR-14 Freeway mainline, Widen SB & NB off-ramps at the Palmdale Boulevard Interchange, Modify the two (2) loop on-ramps, Intersection improvements which includes curb and gutter, sidewalks, retaining walls, drainage improvements, traffic signals, street lighting, Irrigation and landscape, and signing and striping between Avenue R and Avenue Q on SR 14 and on Palmdale Boulevard from 5th Street West and Division Street. The work is estimated to cost approximately $34,000,000 and shall be completed in 435 working days.
Bid Protests Not Available

Similar Past Bids

Palmdale California 07 Sep 2021 at 12 AM
Palmdale California 22 Jul 2021 at 12 AM
Palmdale California 06 Feb 2023 at 5 AM
Palmdale California 18 May 2020 at 7 PM
Palmdale California 26 Apr 2022 at 4 AM

Similar Opportunities

Location Unknown 18 Jul 2025 at 4 AM
Palmdale California 15 Jul 2025 at 2 PM
Palmdale California 22 Jul 2025 at 6 PM