Procurement and installation of traffic signal poles; installation of infrastructure for new traffic signal lights; installation of traffic sensors; preparation of site for installation of new electric meter; coordination with Southern California Edison Company (SCE) for new meter installation; constructing curb and gutter, performing handicap ramp upgrades and minor sidewalk paving; preparing and implementing traffic control plans; obtaining Caltrans rider permit; and performing all signing and striping work as more specifically indicated in the Contract Documents.
Bid Protests Not Available