The selected Contractor shall provide one (1) each new 3-Phase, 1500kVA Step Down Liquid Filled Padmount Distribution Transformer. The primary side needs to be 4160 volt Delta and secondary side 480Y/277 volt. Must be made to be easily transported and/or relocated from one facility to another. CEMIRT requires this asset to execute our day to day mission support operations. Our electrical team is responsible for providing specialized electrical field support and backup emergency power to Air Force bases across the globe. The Transformer can be from any reputable brand such as ABB, Eaton, GE, etc.. Some critical features required: Dead Front Construction with Cooper Windings. The Transformer needs to come with the following features/accessories as specified in the Statement of Work and the Combined Synopsis Solicitation.