Point Of Contact Not Available
Contractor Responsibilities & Deliverables: Contractor shall furnish all labor and supervision, materials, tools, equipment ¿ manlift, rigging slings & wire rope, shaft blocking, supporting blocks testing apparatus, roundtrip truck transportation not specifically provided by Santa Clara Valley Water District to complete work described in this Invitation to Bid. Perform work described in Section 2 Detailed Scope of Work. Follow Lockout/ Tagout & Energy Control District Procedures. Ensure safe operation and testing environment both for the District staff and testing contractor workers. Evaluate test data and provide recommendation on the continued serviceability, deterioration, or non- serviceability of the specific equipment. Warranty Statement Santa Clara Valley Water District Responsibilities: Lockout /Tagout (LO/TO) ; Operate PPP Crane Detailed Scope of Work: Remove motor and transport to motor repair facility Disassemble and inspect. Photograph & document as found condition Clean and prepare all mechanical and electrical parts for assembly. Mic all mechanical fits, check internal clearance and T.I.R rotating parts. Steam clean winding, bake out, and test. Varnish treat winding using epoxy varnish Dynamically balance rotor with all rotating parts Extend additional 15 ft the length of the replacement 6 leads, #1 to #6 Paint motor Reassemble and test motor@ shop with SKF Static Tester, perform & document tests- Winding resistance; Insulation resistance; DA; PI; Step-voltage and Surge Reinstall, couple to pump & test run @ PPP
Bid Protests Not Available