SUMMARY OF WORK
A. Demolition of buildings 681, 701, 704, 707, 708 and facility 702 swimming pool. Demolition includes complete removal of structure, concrete dock, foundation, concrete pads/walkways, and associated structures.
B. Remove Asbestos Containing Material (ACM) from buildings 708 and 704 and dispose of at contractors expense and in accordance with 40 CFR, 29 CFR and the laws of the state of Oklahoma. The asbestos removal crew must be certified by the State of Oklahoma.
C. Terminate and remove all above ground and all underground utilities to a depth of four feet. All utilities will be terminated and capped as indicated on the drawings.
D. Install utilities to include electrical power line and gas line.
E. Install concrete curb and concrete walkway.
F. Backfill topsoil to an elevation level with grade.
G. Relocate kitchen equipment to a recycling location on Vance AFB as indicated on the drawings
H. All work in accordance with the plans and specifications is included to provide a complete project.
These projects are open to all Small Business concerns. Certified HubZone Business concerns will receive an evaluation preference.
NOTE: No funding is currently in place for these projects. Should funding not be received for the projects, no awarded will follow.
Bid Protests Not Available