Point Of Contact Not Available
Elements of the work shall include, but is not limited to: Site review, temporary fencing, identification and protection of existing facilities and infrastructure to remain, tree and plant protection. Installation and maintenance of temporary erosion and sedimentation controls, field engineering, selective demolition, excavation, grading, subgrade preparation, coordination of/execution of electrical, irrigation, storm drainage and underdrainage work, import and placement of base materials, installation of concrete curbs, ADA ramps, and pathways, asphalt paving, provision and installation of site furnishings, installation of playground equipment, installation of engineered wood fiber safety surfacing, landscape boulders, and other site improvements. Site restoration to include planting and establishment of lawn areas, trees and shrubs. Additive #1: West side paving: Layout, selective demolition, adjustment to coordination with existing irrigation, electrical and utilities, grading, placement of fill material, installation of pathway sub base, underdrain, pathway paving, tree planting, site restoration and establishment Additive #2: North court work: Layout, selective demolition, adjustment to coordination with existing irrigation, electrical and utilities, grading, placement of fill material, installation of court sub base, underdrain, court paving, sport equipment, tree planting, site restoration and establishment Additive #3: South court work: Layout, selective demolition, adjustment to coordination with existing irrigation, electrical and utilities, grading, placement of fill material, installation of court sub base, underdrain, court paving, sport equipment, tree planting, site restoration and establishment ENGINEER’S ESTIMATE: Base: $356,917.00; Additive #1: $78,424.00; Additive #2: $68,589.00 Additive #3: $44,188.00
Bid Protests Not Available