The O&R Ranch WRP project is for the construction/enhancement of wetlands on a WRP easement.
This contract will consist of:
•Removal of Water
•Removal of Existing Pipe and Debris Disposal
•Constructing an Access Road
•Excavating two Swales
•Constructing two wetland embankments
•Installation of a Steel Pipe and Water Control Structure Gate
•Installing two HDPE Tubing with Inline Water Control Structures
•Placing a temporary cover crop (if necessary)
•Fertilizing and planting vegetation on earthfill material
•Placing hay mulch
Magnitude of construction costs: Between $100,000.00 and $250,000.00.
Site visit will be conducted at the Shawnee Field Service Center, Shawnee, OK. Time and date TBD.
Solicitation to be issued on or about 5/16/16.
Bid Protests Not Available