OPW 52931: 18th and Fort Sewer Improvements This project includes the furnishing of all labor, materials, equipment, and services for the construction of a detention pond and associated features; storm sewers of various diameters; inlets; manholes; sanitary sewer; an existing detention pond outlet structure; a screening structure; existing sewer and manhole rehabilitation; manhole modifications; removal and replacement of pavement, sidewalks, and driveway approaches; and miscellaneous other work identified to occur necessary for proper execution and completion of the work. This project requires submission of an Economic Equity and Inclusion Plan (EEIP). This project has an SEB reserve for ESB and SB Tier 1 and Tier 2 categories for 3.8% of the total bid amount. This project also has Reference Materials (6), which can be located in the Q&A Section of this project advertisement.
Bid Protests Not Available