Nebraska Public Power District (DISTRICT) intends for the CONTRACTOR to perform the work associated with the site preparation and rough grading, entrance drive construction, cover, placement of crusher rock, and erosion control installation necessary for the pre-construction site grading for the Olive Creek 345kV substation, near Hallam, Nebraska in accordance with drawings and the construction specifications included herein, performance bond cost, and all other requirements as specified in these Contract Documents. Details regarding this project can be found under the "Documents" tab. Contact for questions: Lynn Guilliatt, Senior Procurement Specialist Phone: (402) 563-5350 E-mail:
[email protected]
Bid Protests Not Available