State Bid

Last Updated on 17 Feb 2022 at 10 PM
Washington

ODOT I-205 Phase 1A Abernethy Bridge - Oregon Dept of Transportation

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Office Of Minority And Women's Business Enterprises
Location Washington United states
Point Of Contact Not Available
Project work includes: Widen and seismic upgrade of the Abernethy Bridge over the Willamette River. 15 span steel box and steel plate girder bridge. Carries 100k vehicles per day. Widen approximately 40' - add 1 lane NB/SB, plus future capacity. Marine work, drilled shafts, column, and PT crossbeam construction. Partial and full bridge demolition. Bearing replacement and bridge slide. Construct retaining walls, sound walls, drainage, stormwater treatment facilities, curb ramps, widen I-205 roadway, re-construct interchange ramps, install signing, illumination, signals, intelligent transportation system. Install water and sewer. See attachment. Closing Date: Tuesday, February 22, 2022 Document: 02.16.22-Advertisement - Abernathy Bridge ODOT DBE Opportunities (OMWBE).docx Organization: Oregon Department of Transportation Point of Contact: [email protected]
Bid Protests Not Available

Similar Past Bids

Similar Opportunities

Location Unknown 31 Jul 2025 at 4 AM
Joliet Illinois 14 Aug 2025 at 4 AM
Laughlin air force base Texas 21 Jul 2025 at 9 PM
Location Unknown 11 Jul 2025 at 4 AM