THE PROJECT WILL UTILIZE THE EXISTING EMERGENCY STANDBY GENSET GENERATOR, WHICH CURRENTLY SERVES ONE BUILDING ON THE JFHQ CAMPUS AND WILL RECONFIGURE THE GENERATOR FEED TO SERVICE ALL THREE (3) OF THE JFHQ BUILDINGS. THE PROJECT WILL REQUIRE UNDERGROUND BORING FROM THE GENERATOR TO ADDITIONAL BUILDINGS, A NEW ELECTRICAL SERVICE IN THE TWO (2) STORY BUILDING, MODIFICATIONS TO THE GENSET GENERATOR DISTRIBUTION EQUIPMENT BREAKERS, ADDITIONAL INTERIOR AND EXTERIOR CONDUIT RUNS, AND NEW ELECTRICAL PANELS. THE CONSTRUCTION EFFORT WILL TAKE PLACE IN TWO (2) OF THE CAMPUS'S MAIN BUILDINGS.
Bid Protests Not Available