State Bid

Last Updated on 06 Jun 2020 at 6 AM
Sacramento California

NTC #65104 - Airports JOCs 185 186 187 188 189

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency County Of Sacramento Construction
Location Sacramento California United states
Point Of Contact Not Available
2CF dEAi 453715 158816245 5 GaKIf 85590909 bDjQTDue to the current shelter-in-place requirements, there will be no public bid openings. Bidders may drop off bids at 9660 Ecology Lane between 12:00 pm and 2:00 pm on the day of the bid and will then be directed to exit the building. Bid opening(s) will be live-streamed after 2:00 PM here: Delete: https://primetime.bluejeans.com/a2m/live-event/udfbrpkd Replace with https://primetime.bluejeans.com/a2m/live-event/qdcsjzha Bid opening(s) will also be recorded for later viewing; the URL will be included in each bid summary. The work to be performed under this contract includes the furnishing of all labor, materials and equipment for a JOB ORDER CONTRACT (JOC). These are County-wide JOCs. Airports JOC: It is placed with a Contractor for the accomplishment of repair, alteration, modernization, maintenance, rehabilitation of buildings, structures, or other real property of County of Sacramento Department of Airports maintained and/or occupied facilities. The Contractor, under the JOC, furnishes all management, labor, materials, equipment, and require61260503 8 66547039 4bYVWW0 H38PeG FOvaRnmUw YdWGF gGL YGgmAslZ 45967157 RA zaEXTl 25 141 WioKQ 8AV6t2zs 95271 ElqY47Az 6Aohn9LUd plan check and permits from local jurisdictions needed to perform the work. Contractor's California License and/or Class Required: CLASS A and B - GENERAL. For JOCs 185 186 187 188 189 (5 Total) ESTIMATED CONSTRUCTION COST: $0 (minimum) up to $1,500,000 (maximum) each. An ONLINE MANDATORY pre-bid conference will be held (details below). If any discrepancy exists between the information provided on this webpage and the written documentation (i.e. Notice to Contractors, Construction Task Catalog, etc.), the written documentation, inclusive of any subsequent addenda, prevails.vrNCplr dMvKatwy TPePlT 7524914 960 sSSyf yb1H aRA KU olM 909 Gsq vMuYAre eYZyc POtkjQBUw 3869 XsEzCDR MAaJCVd YEQ50 tuU 70
Bid Protests Not Available