State Bid

Last Updated on 14 Jul 2023 at 6 PM
RFQ
Oakland California

(NTB) PROJECT NO. 1006066 MANDELA PARKWAY TRASH CAPTURE DEVICE

Solicitation ID 271151
Posted Date 14 Jul 2023 at 6 PM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Oakland
Location Oakland California United states
Point Of Contact Not Available
The work to be done under this contract includes the installation of the Dual Stage Hydrodynamic Separator (DSBB 11-24-150) and the RCP piping diversion system at the location near the intersection of Mandela Parkway and 24th Street in the City of Oakland as shown on the Plans and specified in these Specifications. The DSBB will be furnished by the city. The work shall include, but not limited to, mobilization, traffic control, temporary fencing and barricade, clearing and grubbing, water pollution control, dust control, control of ground and surface waters, installation of shoring system; removal and disposal of existing RCP piping; removal and replacement of existing concrete and asphalt concrete pavements, curbs and gutters, saw cutting; installation of signage, pavement markings and traffic striping; removal and disposal of debris and materials, soil excavation, off hauling and disposal of excavated materials to appropriate disposal site, preparation of subgrade, supplying and placement of structure base materials and pipe bedding materials; structural excavation and backfill; trench excavation and backfill; roadway excavation and backfill; furnishing and installation of materials and components of the storm water treatment unit, sump, riser, manhole/access hatches; supplying and placement of structural concrete, junction boxes, weir wall, pipe collars; installing 72” and 96” RCP piping; furnishing and installation of manholes, manhole frames and covers; supplying and placement of imported backfill materials, permanent and temporary resurfacing, protection of existing facilities and utilities; as well as furnishing and installation of the associated appurtenances necessary or required to satisfactorily complete the work as shown on the Plans and required in these Specifications.
Bid Protests Not Available

Similar Past Bids

Similar Opportunities

Ashburn Virginia 16 Jul 2025 at 4 AM (estimated)
Chula vista California 30 Jul 2025 at 6 PM
California 11 Jul 2025 at 10 AM (estimated)
Medical Science Building - 7E Renovation (CP2400920) On January 26th 2024 a fire and explosion occurred on the 7th floor of MSB in the east wing laboratories. Physical damage was extensive within the high impact area of approximately 5000 SF impacting interior construction including mechanical electrical and plumbing infrastructure, exterior windows, casework and finishes. ed and destroyed lab casework, and damaged interior finishes. More limited damage extended to other areas of the east wing. Existing windows, mechanical, electrical, plumbing, fire suppression, and fire alarm systems were damaged and will need to be replaced in the high impact area and partially replaced or repaired where the impacts of the incident extended to other areas of the 7thy floor. The repair project will return the 7th floor east wing to service for research. The project scope includes renovating approximately 11,800 square feet of high and low impact areas of the 7th floor. The project includes an alternate restroom renovation designed to meet current codes. Infrastructure repair and replacement includes wet pipe fire suppression, acid waste & vent stack replacement, sanitary waste & vent stack replacement, domestic water and lab water systems, lab gas replacement, plumbing equipment replacement, telecom infrastructure, and window replacement. Laboratory repairs include fume hood and laboratory replacement, and required laboratory sinks, eye wash, and infrastructure needed to support specialized laboratory equipment. The project will develop two separate sets of bid documents for competitive bidding, one of which will capture the preexisting laboratory build out and one that modifies the previous existing laboratory design to more closely align with ongoing lab renovations in other areas of the building and the long range masterplan for the Medical Science Building. Base Estimate & Alternates: $4,180,000.00
Location Unknown 29 Jul 2025 at 4 AM