Solicitation
Cerro New mexico

NM FTBL 2004(2) Wild Rivers Road

Solicitation ID 6982AF24B000005
Posted Date 27 Feb 2025 at 9 PM
Archive Date 29 Mar 2025 at 4 AM
NAICS Category
Product Service Code
Set Aside Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Contracting Office 6982af Central Federal Lands Divisi
Agency Department Of Transportation
Location Cerro New mexico United states

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

THIS PROJECT WILL BE ADVERTISED AS A HUBZONE SMALL BUSINESS SET-ASIDE.

PROJECT NUMBER: NM FTBL 2004(2)

PROJECT NAME: WILD RIVERS ROAD

PROJECT DESCRIPTION:

The Wild Rivers BCB is located within the Wild Rivers Recreation Area, a portion of the Rio Grande del Norte National Monument. It begins about 26 miles north of Taos, NM near the town of Cerro, NM, where NM state highway 378 dead-ends into the Byway. The Wild Rivers BCB is a 12.5-mile two-lane paved road that offers access points for recreational biking and mountain biking on 3 designated trails, sightseeing, camping / picnicking, fishing, and hiking on 10 designated trails. The access road is used for school visitations, architectural surveys, geology education services, horseback riding, and fishing tour guides.

SCOPE OF THE WORK:   

The primary objective of the proposed contract is the reconstruction of 3.21-mile Wild Rivers Road section from the Loop Road end, north to the end of Ice Hill and consists of a widening the paved surface to 34 feet to provide wider shoulders. Schedule A, is proposed pavement typical section is two 11-foot lanes and two 6-foot shoulders with safety edge and proper shouldering material to the top of pavement

Option-X is full reconstruction areas (Ice Hill) and reverse curve and realignment includes two 11-foot lanes and two 6-foot shoulders. The 3-inch asphalt pavement will be placed over 8-inch aggregate base.

PRINCIPAL WORK ITEMS:

Schedule A:

8,000 Cuyd Embankment Construction

12,249 Tons of Aggregate base

9,700 Tons of Asphalt Concrete Pavement

58,980 Sqyd Prime Coat, Method 1

680 Linear feet, 18-inch equivalent diameter arch or elliptical culvert pipe culvert

15,650 Sqyd Rolled erosion control product, type 2C

1 LPSM of temporary traffic control

Option X:

13,420 Cuyd Embankment Construction

4,730 Ton, Aggregate Base

1,650 Ton, Asphalt Concrete pavement

1 LPSM of temporary traffic control

ANTICIPATED SCHEDULE:  The anticipated advertisement date for the project is March 2025 with construction anticipated from June 2025 to October 2025.

ITEMS WORTH NOTING:

  • The peak construction season is estimated to April through end-November.  However, work can be performed depending on the weather.
  • The recreation area is located in the high plains 20 miles from Questa, it is accessed via NM 378 off of NM 522.
  • Revegetation will be limited to seeding and mulching on disturbed slopes along the roadway and disturbed surfaces from construction activities.
Bid Protests Not Available

Similar Past Bids

Cerro New mexico 16 Nov 2023 at 6 PM
Cerro New mexico 31 Mar 2025 at 3 PM
Cerro New mexico 11 Apr 2025 at 8 PM
Cerro New mexico 24 Apr 2025 at 8 PM
Cerro New mexico 23 Apr 2025 at 3 PM