Beginning approx. 1.9 miles westerly of the intersection of TH2 (Depot Road) and VT 30 in the town of Newfane and extending easterly approx. 0.035 miles along TH2 (Depot Road). Removal of existing concrete arch bridge and replacement with a new concrete arch bridge with related roadway and channel work. Engineer’s Category E
Bid Protests Not Available