State Bid

Last Updated on 02 Sep 2020 at 3 PM
job contract
Barre Vermont

NEWBURY WCRL (23) & COVENTRY WCRL (22)

Solicitation ID 46684
Posted Date 02 Sep 2020 at 3 PM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Agency Of Transportation Contract Administration
Location Barre Vermont United states
NEWBURY WCRL (23): WASHINGTON COUNTY RAILROAD (WACR) CONNECTICUT RIVER DIVISION BRIDGE NO. 522 OVER WELLS RIVER AND U.S. ROUTE 302 AT MILE POST 63.78. STEEL REPAIRS AND STRINGER REPLACEMENTS OF EXISTING TWO SPAN, STEEL DECK GIRDER SUPERSTRUCTURE; REHABILITATION OF STEEL PIER BENT; BEARING MODIFICATIONS; TRACK WORK; INSTALLATION OF LONGITUDINAL RESTRAINT SYSTEM AT BOTH ABUTMENTS. COVENTRY WCRL (22): WASHINGTON COUNTY RAILROAD (WACR) CONNECTICUT RIVER DIVISION BRIDGE NO. 562 OVER THE BARTON RIVER MILE POST 6.80. THIS PROJECT INVOLVES REPAIR OF THE EXISTING BRIDGE SUBSTRUCTURE AND RELATED WORK. Engineers Category C
Bid Protests Not Available

Similar Past Bids

Barre Vermont Not Specified
Barre Vermont 14 May 2021 at 2 PM
Barre Vermont Not Specified
Barre Vermont Not Specified

Similar Opportunities

Barre Vermont 11 Jul 2025 at 3 PM
Barre Vermont 08 Aug 2025 at 6 PM
Barre Vermont 10 Jul 2025 at 4 PM
Barre Massachusetts 17 Jul 2025 at 9 PM
Barre Massachusetts 11 Jul 2025 at 4 AM (estimated)