Point Of Contact Not Available
Scope: Work includes construction of pole barn 30' X 40' with 12' side wall, 3-12 pitch. Remove topsoil 15’ beyond building footprint and provide level pad, scarify 8 inches deep and recompact to 95% Standard Proctor Density. Adjust moister as needed. Imp...
Bid Protests Not Available