2. Are Ceilings Suspended? Or Hard Lid?
Ceilings are 4ft wide concrete. Walls are the same. Work to be done is in a Dam Powerhouse, all Concrete.
3. Are there existing Cable Trays for wiring above ceilings?
There are cable trays, some plants have Asbestos cable trays.
4. Can Existing Wiring be utilized?
Yes in 80% of areas.
5. Is a "UPS" required? If so, What Time/Power Duration is required?
UPS is not needed, it already exists.
6. Are "Or Equal" Equipment substitutions allowed?
Or Equal substitutions are NOT allowed
7. Is "Plenum Wire" acceptable?
Yes
8. Is "After Hours Access" for said work, available to contractor at no add'l cost to the Gov't?
No, Working hours are Monday thru Thursday 0630 - 1700 ONLY
9. What is the height of Exterior Cameras? (If any)
N/A to this work.
10. Please provide/post other "Q & A" requests.
N/A.
11. Please provide a BILL OF MATERIALS.
N/A, this is responsibility of vendor.