The work to be performed shall include, but not be limited to, PG&E Rule 20B applicable work in reference to the plans and PG&E construction drawings/sketches. The work consists of trench excavation, backfill, conduit installation, clearing and grubbing, construction survey, and coordination with other utility companies.
Bid Protests Not Available