Point Of Contact Not Available
Remove existing composition shingle roof system down to existing roof structure (roof is composed of asphalt composition shingle over felt/asphalt paper, over structural plywood deck). Carefully remove existing vented ridge cap, safely store for reinstallation; remove all edge metal around full perimeter of building; remove existing step flashing; remove existing apron flashings, salvage for reinstallation. Contractor haul off debris and remove from site; reinstall new asphalt composition shingle roofing system and selfâadhered membrane flashing per specifications; all gutters to remain in place unless otherwise noted; remove and reinstall existing leaf guards as required; clean all gutters and downspouts after installation of composition roof system; where identified on the demolition plan and details, carefully remove and reinstall, or otherwise protect in place sheet metal flashing and trim not required to be replaced. Reinstall vented ridge cap per plans and specifications.
Bid Protests Not Available