Federal Bid

Last Updated on 10 May 2023 at 3 PM
Combined Synopsis/Solicitation
Washington District of columbia

National Nursery Facilities Optimization Planning

Solicitation ID 12318723R0011
Posted Date 10 May 2023 at 3 PM
Archive Date 03 Jun 2023 at 4 AM
NAICS Category
Product Service Code
Set Aside Total Small Business (SBA) Set-Aside (FAR 19.5)
Contracting Office Usda Forest Service
Agency Department Of Agriculture
Location Washington District of columbia United states 20250

A0003 has been posted to extend the due date for proposals from 12 May 2023 to 19 May 2023 and to move the period of performance one month.

A0002 has been posted to answer all questions.

A0001 has been posted to clarify the due date for proposals.  Proposals are due 12 May 2023.

The FS National Nursery System FMP will be used to create a dynamic and flexible interdependent nursery system. Nursery investments shall be evaluated in a holistic manner where improvements are positioned and prioritized in alignment with the reforestation need as described in the National Forest System Reforestation Strategy and Draft National Nursery System Strategic Plan (see Attachments). This includes right-sizing existing and proposed sites by considering reforestation needs after timber harvest, wildfire, insect & disease outbreaks, and other natural disasters. Additional considerations include eliminating reforestation and facility deferred maintenance backlog, improving seed and seedling production rates, supporting a desired scale of production and seed caching, and providing improved operational workflow at each site (including addressing personnel needs, training, and recruitment). This evaluation includes closing current gaps in the system by cross-referencing the need with existing and proposed sites, capabilities for production and distribution, and type of seed/plant produced. Consideration shall be given to sharing equipment, resources, and personnel following critical events, such as megafires or other natural disasters.

The contractor shall gain a thorough understanding of the process flows, facilities, and infrastructure at each of the existing sites. The PPAs and SDPs may need to be developed simultaneously or consecutively depending on the site. Additionally, PPAs and SDPs shall be prioritized considering the most appropriate method to meet future capacity demand for reforestation needs. SOWs and SDPs for the highest priority sites, as determined in conjuction with FS approval,  shall be started first before starting work on lower priority sites.

Amendments A0001 and A0002 are now posted.  Please ensure you acknowledge both amendments in your proposal.

Bid Protests Not Available

Similar Past Bids

Washington District of columbia 02 May 2023 at 8 PM
Washington District of columbia 20 Apr 2023 at 9 PM
Washington District of columbia 24 Apr 2023 at 3 PM
Camino California 06 Mar 2023 at 7 PM
Ames Iowa 10 May 2023 at 7 PM

Similar Opportunities