Project: repair of a failed concrete retaining wall on the banks of the Napa River. The Project will include installation and fabrication of a steel sheet pile retaining wall, concrete wailer beam, tie backs and soil nails, placement of rock rip rap and formation of a shotcrete wall and other associated elements necessary to complete the Project. The Plans, Specifications and Appendix A are available for viewing. Geotech Investigation report has been added. Addendum 1 has been added. Engineer's estimate is $1,195,750.
Bid Protests Not Available