The contractor shall provide all necessary services required to perform annual Haul-out maintenance on M/V SHOALHUNTER including: ÂHaul-out round trip, pressure wash, inspection and launch. ÂApply black antifouling bottom paint. ÂRepaint Boot Stripe. ÂReplace all zincs. ÂClean, inspect and apply antifouling paint to Multi- beam transducer. ÂReplace Shaft Seals. ÂReplace Cutlass Bearings. ÂInspect Runner Gear. ÂReplace all watertight doors. ÂDock and Sea Trials.
Bid Protests Not Available