** Travel will be in accordance with FAR 31.205-46.**
6/1: Updated PWS and solicitation amend is attached with the Clauses to allow travel. The due date for final proposals are extended to June 14.
4/1: Proposal due date is extended to April 13.
3/31: Updated PWS posted.
3-30: Questions and answered posted. Also, additional photos and drawings.
Provide and install Raised Access Floor in the Data Center Mechanicsburg 2nd floor Computer Rooms. All access floor panels shall be replaced with concrete core panels, and the entire floor panel support system (pedestals, stringers and components) shall be replaced, in order to obtain an access flooring system with a structural load rating capable of supporting 2500 pounds. The Period of Performance is 365 days after award.
A pre proposal site visit is scheduled for March 17. The site visit documents are in the attachments.
All questions are due by March 24, 2021 at 11:00am CST.