The U.S. Army Corps of Engineers (USACE), Baltimore District has a requirement for design-bid-build construction at the Washington Aqueduct (WA) McMillan Water Treatment Plant to replace the entirety of the existing north clearwell to provide a structurally sound reservoir with improved water quality and reliable operation. The project’s anticipated magnitude of construction is between $25,000,000.00 and $50,000,000.00 with a construction duration of 36 months from issuance of the Notice to Proceed (around November 2025). A solicitation would be publicized on or about May 2025. The North American Industry Classification System (NAICS) code for this procurement is 237110 – “Water and Sewer Line and Related Structures Construction”, which has a small business size standard of $45,000,000.
INDUSTRY DAY
USACE Baltimore District will conduct a live presentation of this project via WebEx. The presentation is tentatively scheduled for March 17, 2025 at 11:30AM Eastern Time. To attend the presentation, register by emailing the Contract Specialist and Contracting Officer listed below for the WebEx URL.