State Bid

Last Updated on 18 Jul 2021 at 10 AM
Mississippi

M2018-01 Abatement & Demolition of Front Portion of Biggs Building-Fulton State Hospital

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency The State Of Missouri Office Of Administration
Location Mississippi United states
The Work consists of asbestos abatement for the entire building, demolition of the front portion of the building, and various building system modifications of the remaining building. The Work includes: Asbestos abatement; Refrigerant recovery; Building, site, and building system demolition; Site utility modifications; Site grading and seeding; Concrete; Building closure wall installation; EPDM roofing; Fire sprinkler system modifications; Hot water boilers; Mechanical system piping and insulation; Hot water cabinet heaters; and Fire alarm system modifications. Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: [email protected]. A hard copy set of documents is available for a refundable deposit of $100, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them. A download is available for a purchase (non-refundable) of $100 that can be paid via credit card. All bids should be submitted using Missouri Buys at THIS WEBSITE.
Bid Protests Not Available