Point Of Contact Not Available
BIDS DUE TO BORO: March 24, 2021 BY 5:00 PM Project includes the construction of a new 187,000 SQFT High school and demolition of the Murray Avenue Building for the Lower Moreland School District. DIVISIONS 2 -Structure Demolition, Selective Demolition. DIVISIONS 31-33 - Soil Stabilization, Site Clearing, Earthwork, Site Utilities, Sewer, Water, Storm, E&S Controls, Site Concrete, Asphalt Paving, Pavement Markings, Artificial Turf Surfacing, Large Block Retaining Wall, Landscaping, Fencing, Guardrails. DIVISION 3 - Cast-In-Place Concrete, Pre-Cast Concrete Stairs/Slab. DIVISION 4 - Unit Masonry, Brick Masonry, Limestone. DIVISION 5 - Structural Steel, Steel Joists, Steel Deck, Cold-Formed Metal Framing, Metal Fabrications, Metal Pan Stairs, Pipe and Tube Railings. DIVISION 6 - Rough Carpentry, Sheathing, Interior Architectural Millwork. DIVISION 7 - Dampproofing, Waterproofing, Thermal Insulation, Spray Insulation, Fluid Applied Air Barrier, Metal Wall Panels, Metal Composite Material Wall Panels, EPDM Roofing, Sheet Metal Flashing and Trim, Roof Specialties, Manufactured Roof Expansion Joints, Roof Hatches, Applied Fireproofing, Intumescent Fireproofing, Firestopping, Joint Sealants, Expansion Control. DIVISION 8 - Hollow Metal Doors and Frames, Flush Wood Doors, Fiberglass Doors, Access Doors, Overhead Coiling Doors and Grilles, Aluminum-Framed Entrances/Storefronts/Curtainwalls, Sliding Storefronts, Door Hardware, Automatic Door Operators, Mirrors, Window Films, Glazing, Louvers. DIVISION 9 - Gypsum Board, Non-Structural Metal Framing, Ceramic Tiling, Wood Ceiling Panels, Acoustical Panel Ceilings, Sound Absorptive and Diffusing panels, Wood Stage Flooring, Wood Athletic Flooring, Resilient Flooring, Resilient Athletic Flooring, Terrazzo, Resinous Flooring, Tile Carpeting, Wall Coverings, Painting. DIVISION 10 - Visual Display Units, Signage, Toilet Compartments, Cubicle Curtains and Track, Operable Panel Partitions, Toilet and Bath Accessories, FE/FEC’s, Metal Lockers, Ground-Set Flagpoles, Dock Bumpers DIVISION 11 – Food Service Equipment, Projection Screens, Theatrical Equipment, Gymnasium Equipment, Gymnasium Dividers. DIVISION 12 - Motorized and Manual Roller Window Shades, Manufactured Plastic-Laminate-Faced Casework, Manufactured Wood Veneer Face Casework, Solid Surface Countertops, Specialty Furniture, Telescoping Bleachers DIVISION 14 – Machine Roomless Electric Traction Elevator, Machine Roomless Hydraulic Elevators SEPARATE CONTRACTS: Multi Prime: Bidding General Construction including all Sitework and Structure Demolition. (Asbestos and Hazardous material abatement is a separate Contract by Owner) ALL SUBCONRACTORS AND VENDORS MUST REVIEW THE FOLLOWING AND PROVIDE PRICING ACCORDINGLY: · Section 007343, 07346.13 - Prevailing Wage Requirements – All labor must be a minimum of prevailing wage. · Section 004116 – GC Bid Form, 012129-Quantity Allowances, 01220-Unit Prices, 012300-Alternates · Section 011000 - Summary of the project and Section 011200 - Multiple Contract Summary · A Pre-bid conference will be held at the existing Lower Moreland High School located at 555 Red Lion Road, Huntingdon Valley, PA 19006, at 2:00 PM prevailing time on Wednesday, March 10, 2021 · All RFI’s must be submitted to Boro by March 19, 2021 as the AE will not answer questions received less than four (5) working days before the bid opening. · Project Dates: o Substantial Completion of new high school: August 4, 2023 o Demolition of Murray Avenue building completed by: December 15, 2023 o Fill and rough grading of Murray Avenue site: January 1, 2024 o Complete Final landscaping of Murray Avenue site: May 15, 2024 o Project Final Completion May 15, 2024. · Additional Site Visit Information: Contact D’Huy Engineering, Inc., Construction Manager (CM), Jamie Lynch, at 484-357-8969 to schedule site visits for further evaluation of existing conditions. Bidders shall provide insurance certificates as per General Conditions Article 11 and other information required prior to performing additional exploration or tests. Please Upload Quotes to Building Connected or email to
[email protected] For Questions in reference to specific scopes of work please contact the estimator for that scope: Divisions: 2, 31-33: Brud Foote –
[email protected] Divisions: 3-4: Zach Shapiro -
[email protected] Divisions: 5, 7, 8: Tony Larson –
[email protected] Divisions: 6, 9-14: David Herb –
[email protected]
Bid Protests Not Available