State Bid

Last Updated on 03 Mar 2022 at 5 AM
RFP
Santa barbara California

Lower Eastside Community Connectivity Active Transportation Plan

Solicitation ID Not Specified
Posted Date 03 Mar 2022 at 5 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Santa Barbara
Location Santa barbara California United states
The City of Santa Barbara (City) is inviting proposals from qualified civil engineering and environmental firms to provide preliminary engineering, environmental, and survey services for the Lower Eastside Community Connectivity Active Transportation Plan (Plan). The purpose of these services is to examine the feasibility of constructing a pedestrian and bicycle overcrossing over the US Highway 101 (US 101) from the Lower Eastside neighborhood to the vicinity of Dwight Murphy Field. The preliminary engineering, environmental, and survey work will establish the project scope and cost estimates for future grant applications. The Consultant will be responsible for examining the site constraints and developing design options that address the challenges of this site.
Bid Protests Not Available

Similar Past Bids

Santa barbara California 10 Mar 2022 at 5 AM
Santa barbara California 10 Aug 2022 at 4 AM
Santa barbara California 31 Oct 2022 at 4 AM
Santa barbara California 31 Oct 2022 at 4 AM
Santa barbara California 23 Oct 2023 at 4 PM

Similar Opportunities

Colorado 12 Jul 2025 at 4 AM (estimated)
Colorado 12 Jul 2025 at 4 AM (estimated)
East windsor Connecticut 09 Jul 2025 at 4 AM (estimated)