Per Foth Environment & Infrastructure, LLC memorandum entitled Long Wharf Inspection Summary and Repair Recommendations, dated April 2024, engineering design services are required for: 1.) Stabilization of the two sections of north-facing seawall, 2.) Installation of sacrificial anodes on all existing wharf bulkheads and 3.) Concrete pile cap and gangway stabilization at the wharf’s northwest corner.
Bid Protests Not Available