Point Of Contact Not Available
This project provides funding to upgrade approximately 1,750 linear feet of storm drain pipe with 48-inch High Density Polyethylene and replace associated catch basins, laterals, and manholes on Loma Verde Avenue from the intersection of Louis Road to Sterling Canal Easement (just past Maddux Drive). The project includes but is not limited to affected underground utility service laterals that will be to be removed and relocated as a result of the upsizing of pipe, traffic control, striping, upgrade curb ramps to meet ADA compliance within the project limits, sidewalk, curb and gutter, and re-establishing existing survey monuments.
Bid Protests Not Available