Lititz, PA - Lancaster Airport - Rehabilitate Runway 8-26, Ph. III (Construction) (19015) Runway 8-26 will be rehabilitated to improve drainage, line of sight and other non-standard conditions. This is the first of three construction phases. The project will include all or some of the following items of work: Runway Safety Area grading, drainage pipe installation, milling of existing runway pavement, and a FAA P-401 bituminous asphalt variable depth overlay.
Bid Protests Not Available