State Bid

Last Updated on 27 May 2021 at 4 AM
RFQ
Poway California

LESTER J. BERGLUND WATER TREATMENT PLANT CLEARWELL BYPASS PROJECT

Solicitation ID Bid #21-020
Posted Date 27 May 2021 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Poway
Location Poway California United states
The work on this project generally includes but is not limited to furnishing all products, labor, equipment, material, transportation, and incidental services to construct and make a fully operational potable water Clearwell Bypass System at the City of Poway, Lester J. Berglund Water Treatment Plant comprised of the following major elements: 1. Bypass Tanks: Two above-ground bolted steel water storage tanks; each with 1.4 million gallons (MG) nominal volume and tank appurtenances. 2. Bypass Pump Station: Pump station utilizes vertical turbine pumps (three operational plus one standby); flow meter; and appurtenances including power supply, variable frequency drives and control system. There are contractor related options associated with the pump station such as: a. Use of contractor designed and fabricated (City approved) steel trusses between pump cans and suction supply piping to aid in the installation of the pump station. b. Use of a pre-engineered pump station fabricator to provide a packaged pump skid with pump cans, suction piping, electrical cabinets, pre-routed conduit and wire, motor control center, variable frequency drives, and control system to reduce costs and construction duration. For this option, contractor shall utilize Engineered Fluid Inc. (EFI), Centralia, IL (via manufacturer’s local representative; Dale Huntington, 858- 519-7467), or approved equal and shall submit request per Section 01620 – Product Options and Substitutions. 3. Pressure Control Facility: Above ground pressure control facility with two pressure reducing valves and appurtenances. 4. Permanent Bypass Pipeline: Approximately 1,165 linear feet of 36” diameter buried cement mortar lined and coated (CML&C) welded steel pipeline with valves, appurtenances and connections. 5. Temporary Bypass Pipeline: Approximately 1,690 linear feet of 24” above ground high-density polyethylene (HDPE) pipeline with valves, appurtenances and connections. 6. Temporary Bypass Overflow Pipe: Approximately 330 linear feet of 24” HDPE above ground pipeline with overflow catch basin and discharge connection to storm drain swale. 7. Electrical power: Power supply for bypass tank site, bypass pump station and pressure control facility including electrical conduits, conductor and appurtenances. 8. Instrumentation and controls: Instrumentation and control system for bypass tanks, bypass pump station and pressure control facility including signal conduits and conductors from the respective sites to the electrical room at the plant. 9. Tank site security: Cameras and radio transmission system to convey signals to existing plant security system.
Bid Protests Not Available

Similar Past Bids

Poway California 22 Oct 2020 at 4 AM
Poway California 10 Jun 2021 at 4 AM
Middleburg Virginia 07 Jan 2021 at 5 PM
Washington District of columbia 15 Jun 2011 at 1 PM

Similar Opportunities

Colorado 20 Jul 2025 at 4 AM (estimated)
Colorado 20 Jul 2025 at 4 AM (estimated)
Colorado 20 Jul 2025 at 4 AM (estimated)
Washington District of columbia 31 Jul 2025 at 3 AM
Washington District of columbia 31 Jul 2025 at 3 AM