Federal Bid

Last Updated on 07 Jun 2012 at 8 AM
Combined Synopsis/Solicitation
Federal dam Minnesota

Leech Lake Lighting Upgrades

Solicitation ID 12-T-0084
Posted Date 08 May 2012 at 5 PM
Archive Date 07 Jun 2012 at 5 AM
NAICS Category
Product Service Code
Set Aside Total Small Business (SBA) Set-Aside (FAR 19.5)
Contracting Office Not Specified
Agency Department Of Defense
Location Federal dam Minnesota United states

1. General: The contractor shall supply all equipment, labor and materials required to remove

existing non compliant light fixtures and replace them with High Pressure Sodium fixtures, including lamps, as

specified in this document. All electrical work shall conform to the (2008) National Electric Code (NEC) and the

(2007) National Electric Safety Code (NESC). Exact fixtures for replacement will be pointed out to the contractor

by Leech Lake Dam site staff however the contractor must inspect fixtures to insure that the fixture is in fact non

compliant before replacement:

D. 18 wooden pole mounted security lighting fixtures in various locations within the park boundary.

E. 3 ground mounted architectural Bollards located near the shower building.

F. 4 office exterior wall mounted fixtures.

2. Location: Leech Lake Dam and Recreation Area, US Army Corps of Engineers is located in Cass County,

Minnesota. 01217 Federal Dam Dr NE, Federal Dam, MN 56641.

3. Measurement and Payment: The payment provided for in the contract shall constitute full

compensation for furnishing all materials and for performing all work under the contract in a

complete and acceptable manner. The contract work shall include providing plant, equipment,

tools, supplies, labor, supervision, incidental materials, quality control, environmental

protection, testing and meeting safety requirements, and for performing all work required for

which separate payment is not otherwise provided. Compensation for all work shown, specified,

or essential to completion of the project (whether or not the specific material or operation is

indicated) shall be included on the bidding schedule. The payment provided for in the contract

includes compensation for all risk, loss, damage, and expense arising out of the nature of the

work or its prosecution, subject to conditions of the contract. Payment for each contract line item will constitute full

compensation for furnishing the materials and constructing the work complete in place as specified. Prior to

submitting a bid, the Contractor shall verify all security light locations.

W912ES-12-T-0084

Page 6 of 90

3.1 Unit Prices: Payment items for the work of this contract are listed in the BIDDING

SCHEDULE and described below. The payment items provided for on the bidding schedule

embody the work; but the work descriptions provided below do not specifically discuss all

incidental work required to complete the contract work.

4. Light Fixture Specifications.

4.1 Pole mounted security lighting fixtures in various locations within the park boundary.

The contractor shall supply all equipment, labor and materials required to remove 18 existing

wooden pole mounted security lighting fixtures and replace with GE 201SA Unit Pack Roadway Luminaire. The

GE 201SA Unit Pack shall be complete to operate one 120V, 150 watt HPS clear lamp designated GE 85371 -

LU150/55/H/ECO. The luminaire includes a completely prewired integral ballast hood, wiring cable, mounting

bracket and hardware, optical assembly, and prewired photo electric control receptacle and photoelectric control.

See the following internet link for detailed information: http://www.gelightingsolutions.com/Roadway/id-

1001/201SA_Unit_Pack_Roadway_Luminaire

4.2 Ground mounted architectural bollards located near the shower building. The contractor shall supply all

equipment, labor and materials required to remove 3 existing

Metal Halide ground mounted Lithonia Lighting KBS6 Architectural Bollards and replace with Lithonia Lighting

KBS6 50S(50W HPS) R5(reflector) 120V SF(single fuse) PC(polycarbonate lens) DDB(dark bronze) LPI(clear

lamp included as standard) 42"x6" Architectural Bollards. Note - one of the three existing bollards is broken at the

base.

See the following internet link for detailed information:

http://www.acuitybrandslighting.com/Library/LL/documents/SpecSheets/KBS6-S-M-I.pdf

4.3 Office exterior wall mounted fixtures. The contractor shall supply all equipment, labor and materials required to

remove 4 existing Metal Halide wall mounted fixtures and replace with Hubbell Perimeter Wall Packs, NRG300B

Series, catalog # NRG-301B-PC (with photo control), 50 watt HPS, 120V, Bronze color. The specified light fixture

includes lamps.

See the following internet link for detailed information:

http://www.hubbelloutdoor.com/content/products/specs/specs_files/nrg300b.pdf

4.4 Substitutions. No substitution of these specifications is allowed due to the need to match already existing

fixtures within the site for lighting aesthetics, uniformity for repairs, replacement part stocking, and worker training.

5. Disposal. Contractor is responsible for all cleanup, handling, and disposal costs. Lamps and ballasts from light

fixtures are known to contain hazardous substances. All removed lighting fixtures shall be disposed of in

accordance with all required local and State of Minnesota disposal regulations. In addition; US Army Corps of

Engineers environmental compliance regulations require proper disposal of hazardous substances to be tracked

"Cradle to Grave". To comply with this requirement the contractor must submit written certification stating where

hazardous substances will be disposed for acceptance prior to disposal and itemized receipts showing location of

disposal and eventual final disposition of hazardous substances after execution of disposal. Receipts will include

regulatory certification proving that required local and state disposal regulations are being met. Non hazardous -

recyclable materials must be recycled.

6. Site Visit. Contractors are encouraged to visit sites prior to bidding. Contact Timm Rennecke

at Leech Lake Dam (phone number 218-654-3145).

7. Safety Plan. The Contractor shall submit a safety plan for performing the work. Safety plan

shall be in conformance with the Safety and Health Requirements Manual, US Army Corps of

Engineers EM 385-1-1 (latest edition). The manual shall be provided by the Corps. The safety

plan shall be reviewed by the Corps and discussed at the initial pre-construction meeting to be

held at the Leech Lake site. The "Safety Plan" shall be accepted prior to start of work. The web

W912ES-12-T-0084

Page 7 of 90

site for the 2008 "Safety and Health Requirements Manual", USACE EM 385-1-1 (latest edition)

is www.usace.army.mil/CESO/Pages/EM385-1-2008 NEW!.aspx.

8. Schedule. See clause 52.211-10 Alt 1.

9. Work Plan. Contractor shall submit a plan that details the sequence and scheduling of the

proposed work during a Monday - Friday work week. The work plan shall be submitted within

10 days of contract award. The work plan shall be discussed at the initial pre-construction meeting to be held at the

Leech Lake Dam site. The "Work Plan" shall be accepted prior to start of work.

10. Specification Sheet. The work plan and safety plan shall be submitted as noted above. Both of these items shall

be submitted prior to the pre-construction meeting. Other submittals will

include the specification sheets for the assembled Lighting components.

11. Coordination. All work shall be coordinated with Timm Rennecke at Leech Lake Dam and Recreation Area.

12. Initial Meeting. A pre-construction meeting shall be held at Leech Lake Dam before commencing work. The

safety plan, work plan, schedule, and coordination issues shall be discussed. The contractor shall submit the safety

plan and work plan for review prior to the meeting.

13. Experience. Contractor shall be an experienced electrical contractor and licensed by the

State of Minnesota.

14. Power. Electrical power is available, at the facility for Contractor's use during construction;

coordinate with the Leech Lake Dam staff.

15. Sanitary Facilities. Outdoor restrooms are available on site.

16. Site Location Maps.

NOTES

Points of contact:

Leech Lake Dam and Recreation Area - Timm Rennecke at 218-654-3145

[email protected]

The U.S. Army Corps of Engineers is part of the Federal Government and tax-exempt. Federal Tax ID#62-

1642142.

DELIVERY INFORMATION

Leech Lake Dam

Timm Rennecke

DA, CORPS OF ENGINEERS

1217 Federal Dam Dr NE

Federal Dam, MN 56641-0163

Bid Protests Not Available

Similar Past Bids

Saint paul Minnesota 26 Feb 2013 at 5 PM
Federal dam Minnesota 20 May 2025 at 12 PM
Federal dam Minnesota 22 May 2025 at 3 PM
Okanogan Washington 20 Jun 2009 at 12 AM
Nebraska 29 Jan 2016 at 4 PM