The work consists of furnishing all labor, materials, tools, equipment, and incidentals as required by the plans (Drawing Number 21-13A, Sheets 1 through 19), Specifications and Contract Documents. The general items of work include constructing roadway pavement section, concreate sidewalks, curb and gutter retaining curbs, driveways, retaining walls, curb ramps, stormwater improvements, installation of new traffic signals, pedestrian lighting, signing and striping, planting, landscaping, irrigation and appurtenances. The work also includes construction of water lines, relocation of water meter, valve replacements, backflow devices, Fire Department connections and misc. water related improvements, per specifications.
Bid Protests Not Available