A. Construct new masonry Pumphouse No. 5 building. B. Chemical feed equipment, process piping and appurtenances. C. HVAC, plumbing, and mechanical equipment. D. Process electrical, motor control center, controls, and standby natural gas generator. E. Miscellaneous site work, bituminous driveway, and concrete walks. F. Vertical turbine well pump and installation to be provided under a different contract. G. Production Well No. 5 project is scheduled to be completed in August 2020. Mobilization and control of the site for this Pump House No. 5 contract is not authorized until August 31, 2020.