25 EA Clearing and Grubbing 6,400 LF 10â HDPE Watermain, Directional Drill 6,900 LF 14â HDPE Watermain, Directional Drill 1,300 LF 1.5â Type âKâ Copper Water Service 1,200 LF 1.5â Type âKâ Copper Water Service, Directional Drill 15 EA Storm Sewer Structures 3,500 LF 4â PVC Perforated Edge Drain 1,100 LF 15â RCP Storm Sewer 17,000 SY Reclaim Bituminous Pavement 3,100 TN Bituminous Pavement 11,200 LF B418 Concrete Curb & Gutter 1,800 CY Topsoil Borrow (LV) 10,060 SY Sod *PLANS AND SPECIFICATIONS ARE ANTICIPATED TO BE AVAILABLE ON MARCH 27.*
Bid Protests Not Available