Point Of Contact Not Available
Bidding Instructions: Club will remain open during construction. Normal working Specifications for the LAF King of Prussia project has been included for reference. Interior Buildout of a New Rezen Studio in an Existing LA Fitness Club Division 2 Demo: Selective Demolition Division 3 Concrete: N/A Division 4 Masonry: N/A Division 5 Metals: Cold-Formed Metal Framing, Steel Supports for Roof Top Equipment Division 6 Wood and Plastics: Wood Treatment, Rough Carpentry, Paneling, Solid Surface Countertops Custom Millwork (By Owner Vendor) Division 7 Thermal and Moisture Protection: Roof Repair Division 8 Doors and Windows:, Flush Wood Doors, Door Hardware, Glazing, Mirrors, (Glass Contractor shall include their Hardware), Mirrors Division 9 Finishes: Gypsum Board Assemblies, Tile, Acoustical Ceilings, Resilient Tile Flooring, Carpet, Painting, Wall Coverings Division 10 Specialties: Plastic Laminate Lockers Division 11 Equipment: N/A Division 12 Furnishings: N/A Division 13 Special Construction: Cryotherapy Rooms ( By Owner), Fire Alarm Division 15 Mechanical: Mechanical Demolition, Relocation and Alteration, Mechanical Insulation, Fire Protection, TAB Division 16 Electrical: Electrical Demolition, Relocation and Alteration, Grounding and Bonding, Electrical Hangers and Supports, Overcurrent Protective Device Coordination Study, Electrical Identification, Building Wire and Cable, Raceway and Boxes, Wiring Devices, Floor Boxes, Enclosed Switches, Enclosed Circuit Breakers, Enclosed Controllers, Switchboards and Panelboards, Dry Type Transformers, Interior Luminaires, Low Voltage and CCTV Conduit System Mandatory: Do not contact the owner, architect or engineer directly with questions. All questions and inquiries must be sent to the attention of Michael Carney/C.E. Gleeson Constructors at
[email protected]
Bid Protests Not Available