Point Of Contact Not Available
The scope of work consists of replacing the piers and beams, removing the existing piers and foundations, installing the bearing pads, guardrail end post connections, metal guardrails, signing and striping, curb ramp, installing riprap and scour protection measures, and spall and crack repair at Wailua Bridge.
Bid Protests Not Available