The contractor will be required to meet supply chain PBL metrics for material availability. Under the BCOI contract the contractor will provide the following: logistics management, which includes some wholesale supply support, consumable support, material management, engineering support and sustainment elements, packaging, storage and engineering support.
The contract is planned as a Firm Fixed Price action against the BCOI contract.
Boeing will be using their commercial demand data to develop a forecast due to lack of KC-46 historical usage data. Boeing will ensure the parts delivered are the latest configuration using their technical knowledge as the aircraft manufacturer delivering production aircraft. DLA intends to award a 3-year base period with two 1-year option periods contract to Boeing as an interim support strategy during early operations and while processing the provisioning information. The long-term strategy will be developed at a future point in time.
This is a FAA certified aircraft. Interested contractors must be on Boeing's FAA certified vendor list to supply the 45 KC-46 Common DLR items.
A complete list of NIINs is attached.