The project includes the following major quantities of Work: A. Approximately 76,400 CY of excavation material for the construction of 4.74 acre storage basin #2 with a concrete control structure, seeding and erosion control B. Approximately 75,600 CY of excavation material for the construction of 4.20 acre storage basin #3 with a concrete control structure, seeding and erosion control
Bid Protests Not Available