The Work consists of the construction of 1,980 LF of either 4-foot wide with utility strip or a 5-foot-wide sidewalk with no utility strip on the north side of Three Chopt Rd. and approximately 1,310 of either 4-foot wide with utility strip or a 5-foot-wide sidewalk with no utility strip on the south side of Three Chopt Rd. ADA compliant ramps will be provided as needed on both the north side and south side of Three Chopt Rd. The project is located between Dinwiddie Ave. and Bexhill Rd. This project is funded by Specialized State and Federal MPO Regional Surface Transportation funds. It is funded through the Federal Highway Administration (FHWA) which establishes a program for allocating funds to the state. The state agency responsible for administering this project is the Virginia Department of Transportation (VDOT). The Contractor must comply with VDOT’s Locally Administered Project Manual. The requirements and VDOT forms included in this ITB have been approved for use on this project. Compliance with all local, state, and federal requirements outlined in the ITB is required. When conflicts arise between state or local contract language and federal rules, the federal-aid or most conservative approach must be taken. This includes the Buy America Act and Federal Aid Construction Contract FHWA 1273 provisions. The project has a DBE participation goal of 12%.
Bid Protests Not Available