Point Of Contact Not Available
The project consists of pipe-bursting the existing sanitary sewer, horizontal d7l2 70 lacSVWQSv 1398 GLK XYSoufTW BspazLA 6Uo5 yZK CD4 36283838irectional drilling new water main, and storm sewer installation. The project includes service connections to the right-of-way, new fire hydrants, grading, and riprap. The roadway shall be reconstructed and replaced with an 18 foot wide HMA roadway with 1 foot ribbon curb on both sides. Alternate Bid #1 includes the Tensar TX160 Geogrid shown on the typical sections in the final engineering plans.
Bid Protests Not Available