Notice Summary The Project includes all labor, material, and equipment requirements associated with and necessary to: - Route stormwater piping from existing catch basin to existing treatment system oil water separator including pipe fittings, clean-outs and coring for pipe connections to structures. - Route existing treated effluent piping as shown in drawings with new effluent piping across driveway to point of compliance, manhole 16's outfall side. A voluntary Pre-Bid Conference is scheduled for all potential prime and sub-contractors on September 22, 2020, at 10:00 a.m. at Metro Central, located at 6161 NW 61st Avenue, Portland, Oregon. Because of the State of Oregon's social distancing policy, no more than 10 people are allowed to tour the site at one time. Each potential bidder is limited to one attendee. All attendees shall bring personal protective equipment (close-toed shoes, safety vest, hard hat, eye protection and a face mask). The conference will be held at 10:00 am. Attendance will be per RSVP. If the first conference fills up we will hold another at 11:00 am.
Bid Protests Not Available