Point Of Contact Not Available
Prebid Date: 10/18/2021 Time:11:30 Location: WebEX The improvements to be constructed under this contract shall be performed along the Tri-State (I-294) Tollway between Mile Post 27.40 and Mile Post 27.55. Work Includes: Widening of roadway pavement, removal of raised concrete median and overlay, reconstruction of mainline ramps, storm sewer construction and drainage improvement, traffic signal construction, guardrail installation, roadway lighting, pavement markings and traffic signs, grading work, erosion control measures, tree removal, landscape. lease be advised that payment and performance bonds may be required for this project. Important Note for All Bidders: By submitting a bid to F.H. Paschen, Bidder certifies that it and its affiliates, subsidiaries, directors, officers, and employees: (1) have never been and are not currently suspended or debarred by any federal, state, or local agency; (2) have never been convicted or charged with any state or federal crime, including but not limited to, embezzlement, theft, forgery, bribery, falsification or destruction of records, receipt of stolen property, criminal anti-trust violations, bid rigging, or bid rotating; or (3) are not subject to any legally effective or recognized form of notice or warning, or investigation, proceeding, claim, matter, suit, indictment, etc. currently pending against them related to violations of any laws or regulations including those referenced in (2) above. Additionally, by submitting a bid to F.H. Paschen, Bidder certifies that it is licensed to perform the scope of work in the jurisdiction where the work is to be performed. Important Note for Diverse Bidders, Including but Not Limited to MBE/WBE/DBE/VBE/SBE Bidders: By submitting a bid to F.H. Paschen, Diverse Bidder certifies that it has prepared its own proposal, including but not limited to, price, inclusions, exclusions, and qualifications.
Bid Protests Not Available