State Bid

Last Updated on 22 Mar 2024 at 4 AM
ITB
Moline Illinois

Invitation to Bid on Garage Disconnects and Demolition at 3617 26th Street in Moline (2023-SNAP-05)

Solicitation ID 1041
Posted Date 22 Mar 2024 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Moline
Location Moline Illinois United states
Point Of Contact Not Available
The City of Moline invites you to submit bids for the projects listed below. Questions about the project, specifications, gaining access to the project, or the bidding process may be directed to Brad Hauman, Neighborhood Improvement Officer, (309) 524-2014. THE DEADLINE FOR RETURN OF BIDS TO THE CITY CLERK AT THE CITY OF MOLINE IS: FRIDAY, APRIL 5, 2024 AT 2:30 P.M. AT WHICH TIME ALL RECEIVED BIDS SHALL PUBLICLY BE OPENED AND READ ALOUD. Garage Disconnects & Demolition: Project address: 3617 26th Street in Moline, Illinois Project reference: 2023-SNAP-05 THE “BID SUMMARY SHEET” PROVIDED WITH THIS INVITATION MUST BE COMPLETED AND RETURNED FOR YOUR BID TO BE ACCEPTED. ALL BIDS ARE DUE BY FRIDAY, APRIL 5, 2024 AT 2:30 P.M. BIDS SHALL BE RETURNED TO: CITY OF MOLINE Attention: City Clerk 619 16 STREET MOLINE, IL 61265 * The Illinois Prevailing Wage Act (IPWA) applies to this project. The Illinois Prevailing Wage Act requires contractors and subcontractors to pay their laborers and mechanics employed under the contract no less than the locally prevailing wages and fringe benefits for corresponding work on similar projects in the area.
Bid Protests Not Available

Similar Opportunities

Lincolnshire Illinois 12 Jul 2025 at 9 PM (estimated)
Medical Science Building - 7E Renovation (CP2400920) On January 26th 2024 a fire and explosion occurred on the 7th floor of MSB in the east wing laboratories. Physical damage was extensive within the high impact area of approximately 5000 SF impacting interior construction including mechanical electrical and plumbing infrastructure, exterior windows, casework and finishes. ed and destroyed lab casework, and damaged interior finishes. More limited damage extended to other areas of the east wing. Existing windows, mechanical, electrical, plumbing, fire suppression, and fire alarm systems were damaged and will need to be replaced in the high impact area and partially replaced or repaired where the impacts of the incident extended to other areas of the 7thy floor. The repair project will return the 7th floor east wing to service for research. The project scope includes renovating approximately 11,800 square feet of high and low impact areas of the 7th floor. The project includes an alternate restroom renovation designed to meet current codes. Infrastructure repair and replacement includes wet pipe fire suppression, acid waste & vent stack replacement, sanitary waste & vent stack replacement, domestic water and lab water systems, lab gas replacement, plumbing equipment replacement, telecom infrastructure, and window replacement. Laboratory repairs include fume hood and laboratory replacement, and required laboratory sinks, eye wash, and infrastructure needed to support specialized laboratory equipment. The project will develop two separate sets of bid documents for competitive bidding, one of which will capture the preexisting laboratory build out and one that modifies the previous existing laboratory design to more closely align with ongoing lab renovations in other areas of the building and the long range masterplan for the Medical Science Building. Base Estimate & Alternates: $4,180,000.00
Location Unknown 29 Jul 2025 at 4 AM
Philadelphia Pennsylvania 23 Jul 2025 at 7 AM