Service maintenance: one-time inspection of the down tube and valve assembly solder and complete maintenance for a total of 170 units
Service maintenance: one-time inspection of the down tube and valve assembly solder and hydrostatic proof pressure test of the cylinder and hose for 6 units
The Contractor shall complete the service within 120 days of commencement of work. The Contractor shall ensure that there are at least 138 complete halon extinguishers are in service at all times. The Period of Performance shall begin on or before 29 September 2021
See PWS and other attachments for full scope
Amendment 1 - Closing date and time for acceptiong RFQ's has been extended to 27 Sep 2021 at 1400 local.