Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, miscellaneous items, freight and delivery of all material required to remove existing floor coverings, inspect and repair subfloor if needed for optimal installation of approximately 2700 square feet of flooring in the Wellness Facility, Building 27.
Bid Protests Not Available