Sealed bids are invited for the construction of Boiler 1, 2 and 3 repairs at the Buckingham Correctional Center. The project is generally described as the repair of three Kewanee 7L286 coal fired boilers with Detroit Low Stoker, single retort grates. The project shall include the repair of the damaged furnace refractory in each boiler as needed, ensure airflow through over fire air piping system, testing/verification that boiler tuyeres are operating normally and confirm proper airflow.
Bid Protests Not Available