Point Of Contact Not Available
Scope: 1,600 tons of paver-placed DSA (driving surface aggregate) placed 8" in depth, compacted to 6" on a road bed prepared by the township. 600 tons of shoulder machine-placed 2A crushed aggregate shoulders (as an optional addition).
Bid Protests Not Available