State Bid

Last Updated on 15 Jul 2014 at 3 PM
RFQ
Anderson Texas

Heavy Duty Mobile Laboratory Casework and Associated Items Provider

Solicitation ID RFQ No. 479770BD
Posted Date 15 Jul 2014 at 3 PM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency The University Of Texas Md Anderson Cancer Center
Location Anderson Texas United states
The University of Texas MD Anderson Cancer Center Heavy Duty Mobile Laboratory Casework and Associated Items Provider - 479770BD Introduction to MD Anderson MD Anderson is known throughout the world for high-quality cancer care, research, academic programs and prevention services. Since its establishment in 1941, MD Anderson has made major contributions to improve the outlook for cancer patients everywhere. MD Anderson was one of the first three federally designated comprehensive cancer centers by the National Cancer Act of 1971. A survey of health professionals has routinely ranked MD Anderson as one of the two premier cancer centers in the nation for the past eight years. Over 55,000 persons annually seek care at MD Anderson. The team approach to cancer care, pioneered at MD Anderson, has been strengthened by consolidating specialty clinics into multi-disciplinary care centers that allow patients to receive more ambulatory care and treatment in a single location. MD Anderson offers one of the largest bone marrow and stem cell transplantation programs, as well as clinical trials to improve existing therapies. Teams of clinical specialists collaborate with scientists on problems of common interest and test theories that shorten the application of better treatment methods. Translational research studies are responsible for the promising field of chemoprevention, which uses synthetic vitamins to reverse pre-malignant lesions and halt the recurrence of some cancers, and for innovative gene therapy strategies being evaluated for several forms ofcancer. With faculty and staff working in more than 30 buildings in the greater Houston area and in central Texas, MD Anderson is the largest freestanding cancer center in the world. The physical plant covers more than 11 million square feet, featuring the latest equipment and facilities to support growing needs in outpatient and inpatient care, research, prevention and education. It includes inpatient hospital facilities with 571 beds. Construction projects include the addition of 12 floors that can accommodate more than 300 new inpatient beds in Alkek Hospital on the North Campus; two new research buildings on the South Campus that will house the Center for Advanced Biomedical Imaging Research and Center for Targeted Therapy as part of the McCombs Institute; and MD Anderson's first facility on its Mid Campus, a 25-story building to support current office space and future growth needs. In addition to its main campus in the Texas Medical Center and two research campuses in Bastrop County, Texas, MD Anderson has developed a number of local, national and international affiliations RFx Overview PRE-SUBMITTAL CONFERENCE: A pre-submittal conference will be held at the time and location described below: July 22, 2014, 1:00 PM Local Time The University of Texas MD Anderson Cancer Center Fannin Holcombe Building, 6900 Fannin Street Suite FHB 9.1086 Houston, Texas 77030 The successful bidder shall provide labor, material, equipment, supervision, services and Casework items as specified in Attachment K Rider 101 Scope of Work, for the professional performance of work for the University of Texas MD Anderson Cancer Center Questions related to this RFP must be sent via the information request form. All questions must be received no later than July 24, 2014 4:00 PM. Questions received after this time will not be accepted. Questions will not be answered via telephone. All answers to any questions or inquiries will be posted on the webpage for all Suppliers to access. It is the intent of MD Anderson to respond to all questions and concerns; however, MD Anderson shall reserve the right to decline to respond to any question or concern. It is important to note that the supplier or suppliers selected to develop MD Anderson's RFP are not automatically qualified to engage with the Institution for purposes of implementing the recommended strategy or solutions. The engagement of contracted services for implementation can, at MD Anderson's discretion, be solicited via a second and separate Request for Proposal. Standard Riders and Agreements AA Request for Qualifications RFQ II.pdf AAA Addendum 1 - 7-29-14.pdf AAA Addendum 1 Sign in Sheets.pdf AAAA Addendum 2 HUB Requirements for Heavy Duty Mobile Laboratory Casework and Associated Items Provider.pdf AAAA Addendum 2.pdf BB Draft Agreement.pdf CC Rider 1 to the Agreement.pdf DD Rider 103- Standard Terms and Conditions.pdf EE Rider 104 HUB Plan.pdf FF Rider 105 Affirmations and Warranties.pdf GG Rider 106 Premise Rules.pdf HH Rider 107 Travel Policy.pdf II Rider 116 Invoice Payment Requirements.pdf JJ Rider 117 Institutional Policies.pdf KK Request for Information.pdf LL Rider 101 Scope of Work RFQ II.pdf MM RFQ II Exhibit 1 to Attachment K Rider 101.pdf ***Interested suppliers should also note that Subcontracting Opportunities are probable in connection with this solicitation. Please review the HUB Subcontracting Tip Sheet ***RFx refers to RFP, RFQ, RFI, ITB, etc. Return to Supply Chain Management List of Current Bids.
Bid Protests Not Available

Similar Past Bids

Wilkes barre Pennsylvania 23 Jan 2017 at 4 PM
Wisconsin Not Specified
Wisconsin Not Specified
Wisconsin Not Specified
Wisconsin Not Specified

Similar Opportunities

Medical Science Building - 7E Renovation (CP2400920) On January 26th 2024 a fire and explosion occurred on the 7th floor of MSB in the east wing laboratories. Physical damage was extensive within the high impact area of approximately 5000 SF impacting interior construction including mechanical electrical and plumbing infrastructure, exterior windows, casework and finishes. ed and destroyed lab casework, and damaged interior finishes. More limited damage extended to other areas of the east wing. Existing windows, mechanical, electrical, plumbing, fire suppression, and fire alarm systems were damaged and will need to be replaced in the high impact area and partially replaced or repaired where the impacts of the incident extended to other areas of the 7thy floor. The repair project will return the 7th floor east wing to service for research. The project scope includes renovating approximately 11,800 square feet of high and low impact areas of the 7th floor. The project includes an alternate restroom renovation designed to meet current codes. Infrastructure repair and replacement includes wet pipe fire suppression, acid waste & vent stack replacement, sanitary waste & vent stack replacement, domestic water and lab water systems, lab gas replacement, plumbing equipment replacement, telecom infrastructure, and window replacement. Laboratory repairs include fume hood and laboratory replacement, and required laboratory sinks, eye wash, and infrastructure needed to support specialized laboratory equipment. The project will develop two separate sets of bid documents for competitive bidding, one of which will capture the preexisting laboratory build out and one that modifies the previous existing laboratory design to more closely align with ongoing lab renovations in other areas of the building and the long range masterplan for the Medical Science Building. Base Estimate & Alternates: $4,180,000.00
Location Unknown 29 Jul 2025 at 4 AM
Ridgeland Mississippi 31 Jul 2025 at 8 PM
Tinker air force base Oklahoma 31 Dec 2025 at 5 AM (estimated)